SCDMH Tucker Center Chiller Replacement 

This project consisted of the replacement of two 400-ton air cooled chillers. Also included was the demo and the replacement of existing equipment pads and enlargement equipment masonry enclosure. A 500-ton rental chiller was needed to maintain comfort for occupied patient areas and the replacement of about 250’ ft of existing UG storm drain under and around equipment site was also necessary. This project was mechanical prime and completed in the second quarter of 2020.